EXOS-LINK · INTEGRITY GOVERNOR
OLIKONSTE SYSTEMS · SYNTHETIC SIGNALS · NON-CONFIDENTIAL OVERVIEW
ACT State maintained: ACT
Hysteresis: ON · Dwell: 10 ticks
Output: hash-chained integrity record, Ed25519-signed on export · REST / ROS2 / file tail
Live Integrity Metrics
0.891
INTEGRITY INDEX
0.820
INTEGRITY RESERVE
0.934
COHERENCE SCORE
⚡ FAULT INJECTION ACTIVE
⏸ SUPERVISED — supervised return required before ACT
14-Node Body Model · 5 Segments
PRIMARY 1.00 ARMS 1.00 LEGS 1.00
SUPERVISED RETURN · OPERATOR ACKNOWLEDGEMENT REQUIRED
Holding until operator acknowledges
Evidence Log · Tamper-Evident · Causal Ordering
▸ CAUSAL EVENT SEQUENCE — deterministic timestamps preserved
Compliance · EU Machinery Regulation
OVERALL SCORE
awaiting log...
—
Awaiting evidence pack...
Signal Integrity Layer
0.04
CHANNEL A
0.001
CHANNEL B
Noise Suppression + Timing Coherence
33.2
SNR (dB)
0.94
TIMING COHERENCE
EMI
DOMINANT SOURCE
CH-B + CH-C Trend
HEALTHY OPERATION
System initialised. All 14 nodes reporting nominal integrity.
PHASE 1/60s / 60s
Integrity governor + evidence chain
for autonomous systems.
Full cycle demonstrated: nominal → degraded → HALT → supervised return → recovery → ACT · evidence chain unbroken
STEP 1
20-MIN CALL
Screen-share · the platform
→
STEP 2
SCOPED PILOT
Terms on call · the sensors
→
OUTPUTS
SIGNED EVIDENCE PACKS
integrity record · REST / ROS2 / file tail
state: ACT | DEGRADE | WARN | HALT
Tamper-evident audit trail
Supervised return · hash-chained
Machinery Regulation
Technical details and SDK available under NDA
All company names, product names, and trademarks referenced on this page are the property of their respective owners. Olikonste Systems is not affiliated with, endorsed by, or in partnership with any of the companies named. This page is an independent technical overview prepared for informational purposes only. Nothing on this page constitutes legal advice or a conformity assessment. Final regulatory classification, conformity assessment, and compliance determination depend on system classification, intended use, and the responsible integrator or manufacturer.
Demo uses synthetic signals for illustration. Production integration produces tamper-evident logs under customer control.